© 2023 EnvTech Consult Limited All Rights Reserved.
Projects
Projects Archive
No. |
Client |
Brief of project |
ENERGY SECTOR |
||
|
|
|
1 |
NELSAP
|
Update of Environmental And Social Impact Assessment (ESIA) & Resettlement Action Plan (RAP) For Uganda- D.R.Congo Power Interconnection 400kV Line Project (398km, 70Km in Uganda) � In Joint Venture with Intec Gopa International
|
2 |
Uganda Electricity Distribution Company Ltd |
Cadastral survey and Asset Valuation for affected property and persons along the Distribution 40Km UEDCL�s Interim evacuation of Achwa HPP2, 2019. |
3. |
Uganda Electricity Distribution Company Ltd |
ESIA for 33kv interim evacuation line for Achwa HPP 2 in Pader District, 2019 |
4. |
Crestway Petroleum |
Environmental and Social Impact Assessment for Crestway Fuel Station in Nebbi, 2018 |
5. |
Maji Power Ltd |
Environment and Social Audit for Achwa HPP I and Achwa HPP II, Pader, 2017, 2018 & 2019 |
6. |
Maji Power Ltd/ARPE |
ESIA for Internal transmission line between Achwa HPP1 & Achwa HPP2, (4Km), 2018 |
7. |
Bugoye Hydro Limited |
E&S audit for Bugoye hydropower project located on Rivers Mubuku and ESIA in 13 villages with power house & switchyard in Bugoye village, Bugoye Parish, Kasese District 2016, 2017 |
8. |
P.A Technical Services |
ESIA addendum report for Nkusi small Hydropower plan located at river Nkusi at the border between Kibaale & Hoima districts along Lake Albert in western Uganda 2016 |
9. |
P.A Technical Services |
ESIA for Kigwabya (4.2MW) Hydro power plant in Hoima, 2018 |
|
P.A Technical Services |
ESIA for evacuation lines (33Km) from Nkusi and Kigwabya hydro power plants in Hoima/Kagadi, 2018 |
10. |
P.A Technical Services |
ESIA for access road (9Km) Nkusi small hydro power plant, 2016 |
11. |
P.A Technical Services |
E&S audit of Nkusi SHP located in Ssenjojo village Buhuka Kikuube District and along part of river Nkusi bordering Kibaale District 2017, 2019 |
12. |
Kisinga hydro power Co. Ltd |
ESIA and RAP for Kisinga mini hydro power plant (2.45MW) in Kanyampara, 2017 |
13. |
UMEME Ltd |
ESIA for the Siiti 2 Power Evacuation - Line (130Km) and Plant House, 2018 |
14. |
UMEME Ltd |
ESIA for the UETCL- NAMANVE South Substation Integration, 2018 |
15. |
UMEME Ltd |
ESIA for the Mandela Flour Mills load integration (4Km) 2018 |
16. |
UMEME Ltd |
Project Brief for 33KV underground feeder cable for BMTS factory in Mbarara District 2017 |
17. |
UMEME Ltd |
ESIA for integration of Bujagali 33kV line (14Km) to UETCL substation, 2017 |
18. |
UMEME Ltd |
ESIA for Siiti 2 33kV power evacuation line (132.5km) and Plant House at Bugema Substation in Mbale District 2019; |
19. |
UMEME Ltd |
ESIA for the proposed integration of 33kv line to UETCL substation in Hoima/Masindi, 2016 |
20. |
UMEME Ltd |
ESIA for proposed 33KV feeder line (7Km), to Tororo Cement Industry, 2017 |
21. |
UMEME Ltd |
ESIA for proposed Hima Cement Tororo Sub Station in Tororo District, 2016 |
22. |
UMEME Ltd |
ESIA for proposed Jinja switch yard, Mpumudde, Jinja, 2017 |
23. |
White Nile Consult Ltd |
Annual environmental and Social audit for oil and gas upstream waste treatment and disposal facility located in Hoima District 2017 & 2018 |
24. |
SinoHydro Plot 2E Katalima Bend |
Decommissioning Plan for For TRT Muck Disposal Sites (Ad~s 8, 9 & 10) at Karuma HPP located in Kiryandongo District 2017 |
25. |
Hardrich Investment Ltd |
ESIA for Hardrich Fuel station in Anthony zone Mukono central division Mukono district 2017 |
26. |
GEO OILS Limited |
Environmental and Social Impact Assessment for GEO OIL Fuel station in Mukono,2019 |
27. |
MO OIL Ltd |
Environmental and Social Impact Assessment for MO OIL Filling station in Kayunga 2018 |
28. |
GM Sugar Ltd |
ESIA for the co-generation of electricity at the Sugar factory, Njeru Municipality, Jinja, 2017 |
29. |
Modern Distillers Ltd |
ESIA for the co-generation of electricity at Modem Distillery factory.District 2017 |
MANUFACTURING, PROCESSING AND PRODUCTION |
||
30. |
Mukwano Industries |
Environmental and Social Audits for Mukwano main complex, beverages, Plastics, Personal care products, and Vegetable oil extraction complex plant, 2018 & 2019 |
31. |
Mukwano Industries |
ESIA for Plastics Manufacturing and Water Processing Plants KIBP Namanve 2017 |
32. |
Mukwano Industries |
ESIA for ETP on plots 779 & 809, Block 113, KIBP Namanve 2017 |
33. |
SIM Plastics (U) Ltd |
ESIA for SIM plastics factory located in Wakiso District 2018 |
34. |
Movit Products Ltd |
ESIA for Movit White Oil Storage Tanks located in Wakiso District 2017 |
35. |
MAK4 Ltd |
ESIA for skin care products manufacturing facility in Namanve Industrial Business Park, Mukono District 2019 |
36. |
Toyota Uganda Ltd |
Environmental and Social Audit for Toyota Uganda Limited- Mbale Branch 2019 |
37. |
Toyota Uganda Ltd |
Environmental and Social Audit for Toyota Uganda Limited in Kampala 2018 |
38. |
Toyota Uganda Ltd |
Environmental and Social Impact Assessment for Toyota Uganda Limited Gulu Branch 2018 |
39. |
Roofings Limited |
E&S audit for Roofings factory located on plot 126 along Entebbe road 2017, |
40. |
Lake Perch Ltd |
E&S audit for Lake Perch Fish processing facility located in Kitinda village Katabi Town council Wakiso District 2018; |
41. |
Modern Heavy Engineering |
Environmental and Social Impact Assessment for Modern Heavy Engineering in MMP Industrial Park 2019 |
42. |
Modern Rubber and Cable |
Environmental and Social Impact Assessment for Modern Rubber and Cable in MMP Industrial Park 2019 |
43. |
Modern Allied and Foot wear |
Environmental and Social Impact Assessment for Modern Allied and Foot wear in MMP Industrial Park 2019 |
44. |
Modern Agrichem Limited |
Environmental and Social Impact Assessment for Modern Agrichem Limited in MMP Industrial Park 2019 |
45. |
Modern Distillers Limited |
E&S audit for 30KPLD Alcohol (Molasses Based) Distillery located in Buikwe District 2017 |
46. |
Modern Distillers Limited |
ESIA for Green Field Organic Fertilizer plant located in Model Farm village, Njeru Municipality Buikwe District 2019 |
47. |
SAMEG chemical products |
EIA for the establishment of a Detergent factory - Nov 2014 |
48. |
Kookee Enterprises Limited |
Environment Audit report for the Milk products processing facility - Oct 2014 |
49. |
Ace Cargo Movers Limited |
Environment Impact Statement for the Cold Storage Warehouses, Kibpin Kirinya village, Wakiso, Sep 2014 |
50. |
Kyagalanyi Coffee Limited |
EIA for factory in Mbale |
51. |
Leaf Tobacco & Commodities Limited |
Environmental Audit for cigarette factory in Kireka |
52. |
Bidco Uganda |
Environmental Audit for the factory in Jinja |
53. |
Graphic Systems Limited |
Project brief for thermal boiler at Luzira Industrial park and Environmental Audit for factory in portbell |
54. |
GM Sugar Limited |
ESIA for GM Plastics factory located in Lugazi II village, Njeru West Ward, Njeru Central Division Njeru Municipality Buikwe district 2017 |
55. |
Uganda Wood Impex Limited |
EIA for Wood Processing & Essential Oils Manufacturing Factory in Kalungu District 2015 |
56 |
Kookee Enterprise Limited |
EIA for Kookee Enterprise Limited Ice Cream and yogurt factory Kakajjo zone, Bweogerere estate Kira Town Council Wakiso district 2016 |
DEVELOPMENT AND CONSTRUCTION |
||
57. |
Amazima Ministries International |
EIA for Amazima Secondary School to be located in Model Farm village, Njeru North Ward, Njeru Town Council-Buikwe District 2015 |
58. |
Uganda Police Force |
ESIA for Cancer Diagnostic Center, Kampala District at GPS |
59. |
Gulf Stream Investments Ug Ltd |
Environmental and Social Audit for Acacia Mall located on Plots 8-13/14-16, Cooper Road at Kisementi, Central Division Kampala Capital City Authority |
60. |
Okwakol JP |
Project Brief for Residential Apartments in Wakiso District 2015 |
61. |
Mothers Union |
PB for Commercial Building Rubaga Division Kampala District 2017 |
62. |
Gold Wolf Limited |
E&S audit for the construction works for Friendship Apartments located in Kampala District 2018 |
63. |
Ministry of Trade, Industries and Cooperatives |
Environment & Social Impact Assessment and Resettlement Action Plan for Busia cross border market, 2017 |
64. |
Gudie Leisure Farm |
Detailed PB for the upgrade of Gudie Leisure Farm located on plot 1548 and Block 185, Kira Ward Kira Municipal Council Wakiso District 2019 |
TELECOMMUNICATIONS |
||
65. |
Eaton Towers (U) Ltd |
E&S audits for 303 base transceiver stations in various parts of the country 2015, 2016, 2017, 2018 & 2019 |
|
|
|
Environmental Monitoring and HSE training |
||
|
MotaEngil Uganda |
Air quality and Noise Modelling for a Quarry and 2 Asphalt plants, 2020 Jerome Mugondi, Environmental and Social Manager: Tel: 256-773-378 926 |
|
Getlab services Ltd |
Noise Assessment for the geotechnical laboratory facility in Naguru, 2019
|
|
Uganda National Roads Authority |
Managers Training in Health and Safety Management, 2017 |
|
Oilcom Uganda Ltd (Downstream Oil and Gas) |
Developing Health and Safety Manual for fuel service stations and active depots in Uganda, 2016 |
|
JOSHI Electricals (Supplier to Upstream oil and gas sector) |
Developing Health and Safety policy and Safe Operating Procedures, 2017 |
|
Geotech Solutions |
Assessment of Noise and Vibration for Geotechnical Drilling operations in Hoima. |